Gå direkte til innholdet
Multi-Stage Simultaneous Lot-Sizing and Scheduling
Spar

Multi-Stage Simultaneous Lot-Sizing and Scheduling

?Due to a varying product demand (changing product mix) and different production speeds, bottlenecks may shift between the stages. Hence, an improved version of the General Lot-Sizing and Scheduling Problem for Multiple production Stages (GLSPMS) was developed.
Undertittel
Planning of Flow Lines with Shifting Bottlenecks
Opplag
2013 ed.
ISBN
9783658020880
Språk
Engelsk
Vekt
310 gram
Utgivelsesdato
29.5.2013
Forlag
Springer
Antall sider
182