Siirry suoraan sisältöön
Time-To-Build
Tallenna

Time-To-Build

As large physical capital stock projects need long periods to be built, a time-to-build specification is incorporated in factor demand models. Time-to-build and adjustment costs dynamics are identified since by the first moving average dynamics, whereas by the latter autoregressive dynamics are induced.
Alaotsikko
Interrelated Investment and Labour Demand Modelling With Applications to Six OECD Countries
Kirjailija
Marga Peeters
Painos
Softcover reprint of the original 1st ed. 1995
ISBN
9783540588092
Kieli
englanti
Paino
310 grammaa
Julkaisupäivä
17.2.1995
Sivumäärä
204