Siirry suoraan sisältöön
TBM Tunnelling in Jointed and Faulted Rock
Tallenna

TBM Tunnelling in Jointed and Faulted Rock

Kirjailija:
sidottu, 2000
englanti

This practical guide describes the stage-by-stage development of a method for predicting the penetration rate (PR) and the advance rate (AR) for tunnel boring machines based on an expanded version of the Q-value, QTBM. The author analyzes 145 TBM tunnels that total 1,000km in length. He then develops simple formulae to estimate PR and AR from the QTBM value and to back-calculate QTBM from performance data. The book quantitatively explains actual advance rates as high as five m/hr for one day or as low as 0.005 m/hr for several months. It also covers logging methods, empirical TBM tunnel support design, and numerical verification of support.

Kirjailija
Nick R. Barton
ISBN
9789058093417
Kieli
englanti
Paino
760 grammaa
Julkaisupäivä
1.1.2000
Sivumäärä
184