
Project Management with Dynamic Scheduling
The topic of this book is known as dynamic scheduling, and is used to refer to three dimensions of project management and scheduling: the construction of a baseline schedule and the analysis of a project schedule’s risk as preparation of the project control phase during project progress.
- Alaotsikko
- Baseline Scheduling, Risk Analysis and Project Control
- Kirjailija
- Mario Vanhoucke
- Painos
- 2nd ed. 2013
- ISBN
- 9783642404375
- Kieli
- englanti
- Paino
- 446 grammaa
- Julkaisupäivä
- 11.12.2013
- Sivumäärä
- 318