Siirry suoraan sisältöön
Multi-Stage Simultaneous Lot-Sizing and Scheduling
Tallenna

Multi-Stage Simultaneous Lot-Sizing and Scheduling

?Due to a varying product demand (changing product mix) and different production speeds, bottlenecks may shift between the stages. Hence, an improved version of the General Lot-Sizing and Scheduling Problem for Multiple production Stages (GLSPMS) was developed.
Alaotsikko
Planning of Flow Lines with Shifting Bottlenecks
Painos
2013 ed.
ISBN
9783658020880
Kieli
englanti
Paino
310 grammaa
Julkaisupäivä
29.5.2013
Kustantaja
Springer
Sivumäärä
182