Siirry suoraan sisältöön
Critical Path Analysis in Practice
Tallenna

Critical Path Analysis in Practice

Tavistock Press was established as a co-operative venture between the Tavistock Institute and Routledge & Kegan Paul (RKP) in the 1950s to produce a series of major contributions across the social sciences.
This volume is part of a 2001 reissue of a selection of those important works which have since gone out of print, or are difficult to locate. Published by Routledge, 112 volumes in total are being brought together under the name The International Behavioural and Social Sciences Library: Classics from the Tavistock Press.
Reproduced here in facsimile, this volume was originally published in 1968 and is available individually. The collection is also available in a number of themed mini-sets of between 5 and 13 volumes, or as a complete collection.

Alaotsikko
Collected papers on project control
Toimittaja
Gail Thornley
ISBN
9780415852975
Kieli
englanti
Paino
453 grammaa
Julkaisupäivä
7.5.2013
Kustantaja
Routledge
Sivumäärä
166