Gå direkt till innehållet
Multi-Stage Simultaneous Lot-Sizing and Scheduling
Multi-Stage Simultaneous Lot-Sizing and Scheduling
Spara

Multi-Stage Simultaneous Lot-Sizing and Scheduling

Författare:
Engelska
Lägsta pris på PriceRunner
Läs i Adobe DRM-kompatibel e-boksläsareDen här e-boken är kopieringsskyddad med Adobe DRM vilket påverkar var du kan läsa den. Läs mer
?Due to a varying product demand (changing product mix) and different production speeds, bottlenecks may shift between the stages. In that case, a simultaneous lot-sizing and scheduling of these stages is recommendable. Hence, an improved version of the General Lot-Sizing and Scheduling Problem for Multiple production Stages (GLSPMS) was developed. Moreover, several reformulation techniques were applied to this model to solve it exactly. Besides, a new meta-heuristic which combines the principles of Variable Neighborhood Decomposition Search (VNDS) and Exchange was implemented to find good solutions, even for a real-world problem case. Finally, further model extensions, e.g., for scarce setup resources, were proposed.
Undertitel
Planning of Flow Lines with Shifting Bottlenecks
Författare
Florian Seeanner
ISBN
9783658020897
Språk
Engelska
Utgivningsdatum
2013-05-13
Tillgängliga elektroniska format
  • PDF - Adobe DRM
Läs e-boken här
  • E-boksläsare i mobil/surfplatta
  • Läsplatta
  • Dator