Gå direkt till innehållet
Time-To-Build
Spara

Time-To-Build

As large physical capital stock projects need long periods to be built, a time-to-build specification is incorporated in factor demand models. Time-to-build and adjustment costs dynamics are identified since by the first moving average dynamics, whereas by the latter autoregressive dynamics are induced.
Undertitel
Interrelated Investment and Labour Demand Modelling With Applications to Six OECD Countries
Författare
Marga Peeters
Upplaga
Softcover reprint of the original 1st ed. 1995
ISBN
9783540588092
Språk
Engelska
Vikt
310 gram
Utgivningsdatum
1995-02-17
Sidor
204