Gå direkt till innehållet
TBM Tunnelling in Jointed and Faulted Rock
TBM Tunnelling in Jointed and Faulted Rock
Spara

TBM Tunnelling in Jointed and Faulted Rock

Författare:
Engelska
Läs i Adobe DRM-kompatibel e-boksläsareDen här e-boken är kopieringsskyddad med Adobe DRM vilket påverkar var du kan läsa den. Läs mer
This practical guide describes the stage-by-stage development of a method for predicting the penetration rate (PR) and the advance rate (AR) for tunnel boring machines based on an expanded version of the Q-value, QTBM. The author analyzes 145 TBM tunnels that total 1,000km in length. He then develops simple formulae to estimate PR and AR from the QTBM value and to back-calculate QTBM from performance data. The book quantitatively explains actual advance rates as high as five m/hr for one day or as low as 0.005 m/hr for several months. It also covers logging methods, empirical TBM tunnel support design, and numerical verification of support.
Författare
Nick R. Barton
ISBN
9781040898826
Språk
Engelska
Utgivningsdatum
2026-02-02
Förlag
CRC PRESS
Tillgängliga elektroniska format
  • PDF - Adobe DRM
Läs e-boken här
  • E-boksläsare i mobil/surfplatta
  • Läsplatta
  • Dator