Gå direkt till innehållet
Construction Scheduling with SureTrak 3.0
Spara

Construction Scheduling with SureTrak 3.0

The book covers the use of the SureTrak(R) software in easy format by walking through the software in a way similar to the practical use of the software which makes it easy to apply. It has project examples which allow user to grasp the concept and us the software efficiently. SureTrak(R) is planning and scheduling software that is trademarked and owned by Oracle that can be used in any industry including building, construction, oil & gas and software development.
ISBN
9781456433123
Språk
Engelska
Vikt
386 gram
Utgivningsdatum
1.2.2011
Sidor
188