Gå direkt till innehållet
Beauharnois Scandal
Beauharnois Scandal
Spara

Beauharnois Scandal

Författare:
Engelska
Läs i Adobe DRM-kompatibel e-boksläsareDen här e-boken är kopieringsskyddad med Adobe DRM vilket påverkar var du kan läsa den. Läs mer
In 1929 the Beauharnois Power Corporation began construction on a new power canal and hydroelectric powerhouse some twenty-two miles upstream from Montreal. In this way it sought to divert the flow of the St Lawrence River and enter into vigorous competition with the well-established Montreal Light, Heat and Power Consolidated. In an effort to speed the granting of federal and provincial leases and authorizations, the Beauharnois promoters made large political campaign contributions in 1929 and 1930. When this was revealed in 1931 the company and its promoters were discredited in one of Canada's most serious political scandals. T.D. Regehr has drawn extensively from archival material to tell the story of Beauharnois in all its facets: entrepreneurial, financial, administrative, technological, and political. He gives an intriguing account of one of the less glorious episodes in Canadian corporate history.
Undertitel
A Story of Canadian Entrepreneurship and Politics
Författare
T.D. Regehr
ISBN
9781487580520
Språk
Engelska
Utgivningsdatum
1990-12-15
Tillgängliga elektroniska format
  • PDF - Adobe DRM
Läs e-boken här
  • E-boksläsare i mobil/surfplatta
  • Läsplatta
  • Dator